PRECISION IN every CONNECTION. Excellence IN EVERY PROJECT

Central Tank Battery (CTB) and Central Gas Lift Compressor (CGC) Switch Racks

The Project

Turnkey EPC contract for multiple Central Tank Battery (CTB) and Central Gas Lift Compressor (CGC) switch racks. Switch rack provided a factory assembled and prewired single distribution point for the facility’s electrical and controls/automation infrastructure.

Key Features of Each Facility

➤ Three 150HP 480V Variable Frequency Drives

➤ 2000A 480V Switchboard

➤ 75kVA 480V Transformer

➤ 45kVA 480V Transformer

➤ 200A 480V Automatic Transfer Switch

➤ ABB RMC-100 PLC

Phase 3 Energy and Power Solutions’ Role

  • Civil Construction
  • Structural Fabrication & Painting
  • Instrumentation & Electrical Construction
  • Detailed Design & Engineering
  • Transportation & Crane Services
Switch rack without the upper piece

Gallery

Choose Phase 3 As Your Turnkey EPC Services

Established in 2020, Phase 3 Energy and Power Solutions, LLC is your leading procurement, construction, and fabrication (EPCF) contractor in Midland, TX. Our team is recognized for its expertise in electrical, instrumentation, automation services and more. We pride on delivering high-quality solutions for a variety of projects including pump stations, gas plants, tank batteries, SWDs, power line distribution, terminal stations, and more.

Our work is defined by our core values: Integrity, Safety, Accountability, and Respect. With licenses in Texas, New Mexico, Colorado, and Louisiana, we bring all the tools to the table and ensure your projects success in every step of the way.

Choose a team that delivers precision in every connection and excellence in every project.

Ready To Power Your Next Project?

Our goal is to become your One Stop Shop providing all EPC services (engineering, procurement, construction and fabrication) you need for long-term results. Get in touch today to see all the ways Phase 3 EPS can become the ideal EPC contractor for your operations in the field.